Ansaldo Energia will supply power generation equipment and refurbish for a new combined cycle plant in Servola, Italy. The order includes an AE64.3A gas turbine and the Ansaldo Energia Plant Optimizer management system. The plant, in combined-cycle configuration with a power of 120 MW, will be operational by the end of 2021. Gruppo Arvedi, a European steel manufacturer, made the purchase.
First GE Vernova Aeroderivative Gas Turbine Operates on 100% Hydrogen
November 20th 2024The LM6000 gas turbine units feature a newly designed fuel nozzle, optimized water injection schedules, advanced control modifications, and safety features, including nitrogen purge systems and hydrogen fire detection systems.