APR Energy, a global leader in fast-track power solutions, announces today that it has signed a contract for a 12-month project by the Ministry of Energy, Water and Mines in Benin to provide 50MW of power generation using its fuel-flexible aeroderivative turbines. The turbines will be fuelled by natural gas, with the ability to seamlessly switch to diesel based on cost and availability. The project is expected to come online in December.
"We are honored to assist Benin in its effort to become self-reliant when it comes to power generation," said APR Energy Chairman and Chief Executive Officer John Campion. "Benin currently imports a significant portion of its electricity from neighboring Ghana, Ivory Coast and Nigeria, and this project will allow Benin to grow its economy using domestically produced power. Another economic benefit will come from the fact that most of the employees who will install, operate and maintain our power plant will be hired and trained from the local workforce."
With the 50MW in Benin, APR Energy will have installed more than 1,000MW of generating capacity in 11 African countries since 2008. "As a partner in the U.S. government's Power Africa initiative, we are proud to be playing a significant role in bringing electricity to the people and businesses of Sub-Saharan Africa," Campion said.
First GE Vernova Aeroderivative Gas Turbine Operates on 100% Hydrogen
November 20th 2024The LM6000 gas turbine units feature a newly designed fuel nozzle, optimized water injection schedules, advanced control modifications, and safety features, including nitrogen purge systems and hydrogen fire detection systems.