Capstone Green Energy's Distributors Secure Orders for microturbines in oil and gas, brewing, and renewable natural gas (RNG) Processing Plants
Capstone Green Energy revealed its distributors obtained a number of orders for its C1000 Signature Series microturbines. These installations target different sectors, such as oil and gas extraction, brewing operations, and RNG processing plants.
Horizon Power Systems, Capstone's distributor, has secured a supplementary order for two C1000 microturbines designated for a remote natural gas compression facility. Meanwhile, Arctic Energy, Capstone's authorized Alaskan distributor, acquired orders for C600S and C65 offshore microturbines, intended for oil and gas production site deployment.
Lastly, Capstone Green Energy has attained an order for a C1000S microturbine rental package to be utilized in an Ecuadorean oil field. This low-maintenance turbine will replace an existing diesel generator.
First GE Vernova Aeroderivative Gas Turbine Operates on 100% Hydrogen
November 20th 2024The LM6000 gas turbine units feature a newly designed fuel nozzle, optimized water injection schedules, advanced control modifications, and safety features, including nitrogen purge systems and hydrogen fire detection systems.