BCCK Holding Company (BCCK) has entered into an engineering, procurement and construction (EPC) contract with Discovery DJ Services (Discovery) for delivery of a 225 MMSCFD gas plant in Weld County, Colorado.
The new plant will take Discovery’s processing capacity to about 500 MMCFD in the first half of 2019. BCCK will provide ethane recovery and ethane rejection and will perform all engineering, fabrication and construction services for the project.
First GE Vernova Aeroderivative Gas Turbine Operates on 100% Hydrogen
November 20th 2024The LM6000 gas turbine units feature a newly designed fuel nozzle, optimized water injection schedules, advanced control modifications, and safety features, including nitrogen purge systems and hydrogen fire detection systems.