GE will provide maintenance services and a suite of digital solutions for the upcoming 718 MW combined cycle power plant at Meghnaghat, Narayanganj, Bangladesh owned by Reliance Bangladesh LNG & Power Ltd, a joint venture between India’s Reliance Power Limited and Japan’s JERA Co., Inc.
The 22-year agreement includes equipment maintenance on the gas and steam turbines, and auxiliaries, and implementation of plant-wide digital solutions on cloud APM (Asset Performance Maintenance) Health & Reliability, OPM (Operations Performance Maintenance) Performance Intelligence, and BaseLine Security Centre for the contract term.
The Meghnaghat power plant will be powered by two GE 9F gas turbines, one GE D11 steam turbine and three H53 generators. It will utilize re-gasified liquified natural gas (LNG) fuel to generate the equivalent electricity needed to supply more than 850,000 homes in Bangladesh.
GE will also provide AGP upgrade for two GE 9F.03 gas turbines, steam turbine refurbishment along with control upgrades and supply the associated parts.