Capstone Green Energy has entered into a two-year, long-term rental contract with a new end-use customer in the cryptocurrency mining space. This Energy as a Service (EaaS) rental system is located on an oil and gas well where a remote data center handles large volume, blockchain and cryptocurrency mining.
First GE Vernova Aeroderivative Gas Turbine Operates on 100% Hydrogen
November 20th 2024The LM6000 gas turbine units feature a newly designed fuel nozzle, optimized water injection schedules, advanced control modifications, and safety features, including nitrogen purge systems and hydrogen fire detection systems.