Inkoo project to be completed by December 2022
Gasgrid Finland is constructing a new LNG terminal vessel in Fortum’s deep-water port in Inkoo, Finland. The terminal vessel plays a major role in the development of the gas markets in Finland and the Baltics. Commercial rules of the terminal ensure fair treatment for all market operators. Gasgrid Finland drew up the rules in collaboration with market participants.
New port structures will be constructed concurrently in Finland and Estonia. If the structures in Estonia complete first, the vessel can be temporarily located there for the first winter until the structures in Inkoo complete. The schedule and situational snapshot will become clearer as the construction progresses.
First GE Vernova Aeroderivative Gas Turbine Operates on 100% Hydrogen
November 20th 2024The LM6000 gas turbine units feature a newly designed fuel nozzle, optimized water injection schedules, advanced control modifications, and safety features, including nitrogen purge systems and hydrogen fire detection systems.