Siemens has won a significant order from Oil and Natural Gas Corporation Limited (ONGC) in India to overhaul 18 units of RT48S & RT56 power turbines of Siemens fleet of aeroderivative gas turbines driven by Industrial AVON & Industrial RB211 gas generators along with installation and commissioning services. The turbines are operating at Mumbai High Asset and Neelam & Heera Asset of ONGC in Mumbai.
The overhauling incorporates Siemens' Zero Hour Overhaul services. The Zero Hour Overhauling will be first of its kind in India and involves the overhaul of power turbines to zero hour status. Traditionally, ONGC's power turbines undergo a Time Continued Overhaul where after overhauling the units can run for another 50,000 hour before the next overhaul.
Under the newer concept of Zero Hour Overhaul, the turbines will be brought to zero hour status. The turbine will perform almost as new – capable of safe and reliable operation for another 100,000 hours before the next overhaul. This will help reduce down-time and improve productivity by eliminating at least one intermediate overhaul.
First GE Vernova Aeroderivative Gas Turbine Operates on 100% Hydrogen
November 20th 2024The LM6000 gas turbine units feature a newly designed fuel nozzle, optimized water injection schedules, advanced control modifications, and safety features, including nitrogen purge systems and hydrogen fire detection systems.