GE Hitachi Nuclear Energy has announced that Dominion Energy will provide funding to help progress the BWRX-300, a 300 MWe small modular reactor design being developed by GEH. Dominion Energy’s funding of the BWRX-300 provides seed money to further work that could lead to commercializing this technology. The company has no plan at this time to build one at any of its commercial nuclear stations.
The BWRX-300 leverages the design and licensing basis of the NRC-certified ESBWR. Through design simplification, GEH projects the BWRX-300 will require up to 60 percent less capital cost per MW when compared to other water-cooled SMRs or existing large nuclear designs. If these savings can be achieved, the BWRX-300 can become cost-competitive with power generation from combined cycle gas and renewables. The BWRX-300 is the company’s 10th generation boiling water reactor design.
First GE Vernova Aeroderivative Gas Turbine Operates on 100% Hydrogen
November 20th 2024The LM6000 gas turbine units feature a newly designed fuel nozzle, optimized water injection schedules, advanced control modifications, and safety features, including nitrogen purge systems and hydrogen fire detection systems.