TransCanada Turbines (TCT) has opened a new 220,000 ft2 overhaul and repair facility in Airdrie, Alberta. The new facility houses production, project management and support staff for TCT’s GE Level 4 and Rolls-Royce MROC services, and replaces the old facilities in Calgary and Airdrie.
The plant allows for the induction of any engine type – Avon, RB211 (including DLE and GT), LM2500 (including LM2500+) or LM6000. A cellular production design enables TCT to meet user turnaround time demands, and features in-house inspection, clean line, Non-Destructive Testing (NDT), disassembly, build, materials and balance capability.
Building amenities include covered truck bays, and 18 overhead cranes, ranging up to 20 m.t. The facility has a fully automated clean line, walkthrough NDT line, dedicated space for blade and vane NDT, an enclosed inspection room and extensive balancing capabilities.
CO2 Compressor Solutions for Carbon Reduction Initiatives
December 23rd 2024In this paper, we will explore the multifaceted challenges associated with handling CO2, the advanced technologies within Mitsubishi Heavy Industry Compressor’s growing portfolio and how our expertise is driving the transition towards a carbon-neutral society.