Two of the four existing ORC units will be replaced with Exergy’s ORC system, based on a single-pressure-level cycle, to produce clean electricity using its radial outflow turbine technology.
The investment in its Aiken, SC, facility will expand production capacity for the mtu Series 4000 engines by enhancing in-house machining capabilities and enlarging the site.
The Renewable Integration and Grid Security project is a PowerFLX installation driven by eight aeroderivative turbines designed to provide reliable backup for renewables and stabilize the grid.