mso-hansi-theme-font:minor-latin;mso-bidi-font-family:Arial;color:#333333">Alstom and JSC Mosenergo, Russia, recently signed a long-term service agreement for a PGU-420 combined cycle power plant. The contract signed for the 420 MW power generating unit # 8 at the combined heat and power plant TPP-26, located in Moscow is valued at more than Euros 100 million.
mso-ascii-theme-font:minor-latin;mso-fareast-font-family:"Times New Roman";
mso-fareast-theme-font:minor-fareast;mso-hansi-theme-font:minor-latin;
mso-bidi-font-family:Arial;color:#333333;mso-ansi-language:EN-US;mso-fareast-language:
EN-US;mso-bidi-language:AR-SA">The 14-year service agreement includes all maintenance to be carried out at the plant, including management of daily service as well as supply of spares. Equipment covered includes all Alstom equipment in the generating unit # 8, consisting of one GT26 gas turbine, one steam turbine, two air-cooled generators and additionally one heat recovery steam generator (HRSG).
First GE Vernova Aeroderivative Gas Turbine Operates on 100% Hydrogen
November 20th 2024The LM6000 gas turbine units feature a newly designed fuel nozzle, optimized water injection schedules, advanced control modifications, and safety features, including nitrogen purge systems and hydrogen fire detection systems.