The facility will process up to 400,000 tons of waste annually.
Doosan Škoda Power supplied Acciona with a steam turbine for the Avertas Energy facility in Australia. The Avertas Energy facility is the first of a number of planned energy from waste projects for energy recovery in Australia. It will process up to 400,000 tons of waste annually, while exporting approximately 45 MW of baseload renewable electricity to the grid.
Doosan Škoda Power designed, manufactured and delivered a 45MW DST-G20 single-body turbine model. The delivery also includes the transmission unit and the power generator. In addition, Doosan Škoda Power will be responsible for providing technical assistance during assembly and subsequent commissioning of the facility.
First GE Vernova Aeroderivative Gas Turbine Operates on 100% Hydrogen
November 20th 2024The LM6000 gas turbine units feature a newly designed fuel nozzle, optimized water injection schedules, advanced control modifications, and safety features, including nitrogen purge systems and hydrogen fire detection systems.